Buying Land

The Cheapest Lot Isn't Always the Least Expensive
Finding land you love is only the beginning.
A $40,000 parcel that requires extensive grading, a long driveway, difficult utility connections or an expensive septic system could ultimately cost more than a $60,000 parcel that's ready for development.
Before purchasing property for a manufactured or modular home, investigate:
Zoning and permitted home types
Minimum home size and setback requirements
Road and delivery access
Topography and grading
Drainage and soil conditions
Well and septic feasibility
Water and sewer availability
Electrical and utility connections
Foundation requirements
Deed restrictions or subdivision requirements
Costs of preparing the property for your home
One of the most important rules in factory-built housing: Don't buy the land first and ask whether your home will work on it later.
Whenever possible, evaluate the land and the proposed home together before making a commitment.
Gary can work with you and your Realtor to help identify the questions that should be answered before you purchase.




Comments